TR 212 over BELL BRANCH

NE GREENUP W IL 130 · County 035, Illinois · Built 1922 · 1 Lanes · 25 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
018307300000000
Year Built
1922
Length
10.1 m (33.1 ft)
Max Span
9.6 m
Width
6.5 m (21.3 ft)
Lanes
1
Daily Traffic
25
Material
Concrete
Design
Other
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$246,000
Total Project Cost
$274,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.