IL 121 (FAP 773) over EMBARRAS RIVER

NW CL GREENUP · County 035, Illinois · Built 1960 · 2 Lanes · 3,450 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
018001900000000
Year Built
1960
Reconstructed
1995
Length
91 m (298.6 ft)
Max Span
25.2 m
Width
10.7 m (35.1 ft)
Lanes
2
Daily Traffic
3,450
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.