FAP 773 (IL 121) over LONG POINT BRANCH
1.3 MI E MONTROSE RD · County 035, Illinois · Built 2022 · 2 Lanes · 1,600 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
39.272703, -88.355767
This bridge is in worse condition than 15.4% of bridges in County 035. The average bridge in Illinois is 0 years old; this one is 4 years old.
Nearby Bridges
IL 121 (FAP 773) over MULE CREEK
Built 2010
TR 52 over LONG POINT CREEK
Built 1978
FAP 828 over BRUSH CREEK
Built 1981
IL 121 (FAP 773) over OTTER CREEK
Built 1933
TR 64 over MULE CREEK
Built 1980
TR 149 over BUSH CREEK
Built 1997
TR 89 over MULE CREEK
Built 2006
FAP 828 (IL 121) over LONG POINT CREEK
Built 2016
TR 54 over BUCK BRANCH
Built 1983
TR 34 over LONG POINT CREEK
Built 1974
Bridge Details
- Structure #
- 018006500000000
- Year Built
- 2022
- Length
- 29.9 m (98.1 ft)
- Width
- 10.6 m (34.8 ft)
- Lanes
- 2
- Daily Traffic
- 1,600
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.