FAP 828 over BRUSH CREEK
1.5 MI S IL 121 · County 035, Illinois · Built 1981 · 2 Lanes · 2,450 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 7 | Good |
Location
39.254575, -88.377939
This bridge is in worse condition than 58.6% of bridges in County 035. The average bridge in Illinois is 0 years old; this one is 45 years old.
Nearby Bridges
TR 149 over BUSH CREEK
Built 1997
TR 64 over MULE CREEK
Built 1980
FAP 773 (IL 121) over LONG POINT BRANCH
Built 2022
IL 121 (FAP 773) over MULE CREEK
Built 2010
TR 52 over LONG POINT CREEK
Built 1978
TR 20 over SPRING POINT CREEK
Built 1985
TR-157 over Spring Point Creek
Built 2017
FAS 1656(CH 7) over SPRING POINT CREEK
Built 1995
TR 181 over SPRING POINT CREEK
Built 1979
FAP 828 (IL 121) over LONG POINT CREEK
Built 2016
Bridge Details
- Structure #
- 018005600000000
- Year Built
- 1981
- Reconstructed
- 2019
- Length
- 22.6 m (74.1 ft)
- Max Span
- 7.6 m
- Width
- 10.7 m (35.1 ft)
- Lanes
- 2
- Daily Traffic
- 2,450
- Material
- Concrete
- Design
- Slab
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A