IL 121 (FAP 773) over COTTONWOOD CREEK

1 MI SE OF TOLEDO · County 035, Illinois · Built 1960 · 2 Lanes · 3,150 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
018001800000000
Year Built
1960
Reconstructed
2000
Length
38.9 m (127.6 ft)
Max Span
13.9 m
Width
10.3 m (33.8 ft)
Lanes
2
Daily Traffic
3,150
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$518,000
Total Project Cost
$604,000