US 40(FAS 1707) over EMBARRAS RIVER
.7 MI W OF GREENUP · County 035, Illinois · Built 1950 · 2 Lanes · 1,800 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
5
Fair
Superstructure
4
Poor
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 4 | Poor |
| Substructure | 5 | Fair |
Location
39.237292, -88.187233
This bridge is in worse condition than 93.5% of bridges in County 035. The average bridge in Illinois is 0 years old; this one is 76 years old.
Nearby Bridges
FAS 657 over EMBARRAS RIVER
Built 2000
FAS 657 over Embarras River OF
Built 2024
US-40 (FAS-1707) over Mill Road (MS- 5990)
Built 1950
US 40(FAS 1707) over LINCOLN ST(MS 1230)
Built 1950
IL 121 (FAP 773) over EMBARRAS RIVER
Built 1960
I-70 (EB) over IL 121 (FAP 773)
Built 1969
I-70 (WB) over IL 121 (FAP 773)
Built 1969
I-70 (EB) over EMBARRAS RIVER
Built 1969
I-70 (WB) over EMBARRAS RIVER
Built 1969
FAP 116 (IL 130) over CSXT RR
Built 1931
Bridge Details
- Structure #
- 018000800000000
- Year Built
- 1950
- Length
- 138.9 m (455.7 ft)
- Max Span
- 26.9 m
- Width
- 9.8 m (32.2 ft)
- Lanes
- 2
- Daily Traffic
- 1,800
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,759,000
- Total Project Cost
- $2,052,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.