I-294 80 WB over MARKHAM YD IC RR
1.2 M W ILL 1 P24 · County 031, Illinois · Built 1958 · 3 Lanes · 84,600 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
41.578039, -87.660994
This bridge is in worse condition than 35.3% of bridges in County 031. The average bridge in Illinois is 0 years old; this one is 68 years old.
Nearby Bridges
I-294 80 EB over MARKHAM YD IC RR
Built 1958
I-294 80 WB over DIXIE HIGHWAY
Built 1958
I-294 80 EB over DIXIE HIGHWAY
Built 1958
I-294 80 EB over CENTER ST & IC RR
Built 1958
I-294 80 WB over CENTER ST & IC RR
Built 1958
171ST ST over I-80/294
Built 1962
I-294 over STREAM
Built 1958
I-80 WB over I 294
Built 1966
I- 80 EB TO I-294 over I-294
Built 1968
I- 80 EB TO I-294 over DITCH
Built 1959
Bridge Details
- Structure #
- 016971700000000
- Year Built
- 1958
- Length
- 538.6 m (1767.1 ft)
- Max Span
- 48.5 m
- Width
- 17.7 m (58.1 ft)
- Lanes
- 3
- Daily Traffic
- 84,600
- Material
- Prestressed Concrete
- Design
- Other
- Owner
- State Toll Authority
- Last Inspected
- N/A
- Est. Improvement
- $6,457,000
- Total Project Cost
- $9,686,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.