I-294 80 EB over DIXIE HIGHWAY

1.5 M W ILL 1 P24 · County 031, Illinois · Built 1958 · 3 Lanes · 84,600 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
016971400000000
Year Built
1958
Length
25.3 m (83 ft)
Max Span
24.1 m
Width
17.8 m (58.4 ft)
Lanes
3
Daily Traffic
84,600
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Toll Authority
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.