SB I-294 over I-55

I294 AT I55 · County 031, Illinois · Built 2021 · 4 Lanes · 76,550 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
016952000000000
Year Built
2021
Length
209.4 m (687 ft)
Max Span
54.7 m
Width
25.3 m (83 ft)
Lanes
4
Daily Traffic
76,550
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Toll Authority
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.