I-94 (WB) over Skokie Highway

0.1 Mi W of US 41 · County 031, Illinois · Built 2020 · 2 Lanes · 33,850 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
016903900000000
Year Built
2020
Length
34.9 m (114.5 ft)
Max Span
33.5 m
Width
13.8 m (45.3 ft)
Lanes
2
Daily Traffic
33,850
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Toll Authority
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.