SHERMER RD over M F N BR CHICAGO RIV

0.1 M SW IL 68 · County 031, Illinois · Built 1959 · 2 Lanes · 5,700 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
016081400000000
Year Built
1959
Reconstructed
2012
Length
15.2 m (49.9 ft)
Max Span
14.3 m
Width
12.2 m (40 ft)
Lanes
2
Daily Traffic
5,700
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$269,000
Total Project Cost
$404,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.