HOFFMAN BLVD over EJ&E RAILROAD

0.6 MI W OF IL 59 · County 031, Illinois · Built 1997 · 4 Lanes · 3,000 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
016635000000000
Year Built
1997
Length
64.8 m (212.6 ft)
Max Span
21.5 m
Width
18.6 m (61 ft)
Lanes
4
Daily Traffic
3,000
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.