IL 72 WB (HIGGINS over RR - WI CENTRAL LTD
.65 M NW IL 59 · County 031, Illinois · Built 1938 · 2 Lanes · 21,900 vehicles/day
Overall
Deck
7
Good
Superstructure
5
Fair
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 5 | Fair |
| Substructure | 7 | Good |
Location
42.077636, -88.201192
This bridge is in worse condition than 62.9% of bridges in County 031. The average bridge in Illinois is 0 years old; this one is 88 years old.
Nearby Bridges
IL 72 EB over RR - WI CENTRAL LTD
Built 1991
HOFFMAN BLVD over EJ&E RAILROAD
Built 1997
I-90 (EB) over WCL RR
Built 2016
I-90 (WB) over WCL RR
Built 2016
IL 59 (SUTTON RD) over I- 90 ADAMS TOLL
Built 1991
Bartlett Road over I-90
Built 2014
BEVERLY ROAD over I-90
Built 1995
IL 72 EB HIGGINS over I- 90 ADAMS TOLLWAY
Built 2016
IL 72 WB (HIGGINS over I- 90 ADAMS TOLLWAY
Built 2015
IL 58 (GOLF RD) over POPLAR CREEK
Built 1977
Bridge Details
- Structure #
- 016050200000000
- Year Built
- 1938
- Reconstructed
- 1979
- Length
- 47.9 m (157.2 ft)
- Max Span
- 18.3 m
- Width
- 13.8 m (45.3 ft)
- Lanes
- 2
- Daily Traffic
- 21,900
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.