Hayes Drive over Pedestrian Underpass

.05 MI W LSD (US 41) · County 031, Illinois · Built 2023 · 6 Lanes · 14,200 vehicles/day

Overall
Good
Superstructure
9
Excellent
Substructure
9
Excellent

Bridge Details

Structure #
016629000000000
Year Built
2023
Length
10.4 m (34.1 ft)
Max Span
10 m
Width
28.8 m (94.5 ft)
Lanes
6
Daily Traffic
14,200
Material
Concrete
Design
Frame (except frame culverts)
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.