HAYES DR over JACKSON PK LAGOON

6300 S & 1900 E · County 031, Illinois · Built 1902 · 4 Lanes · 14,200 vehicles/day

Overall
Fair
Superstructure
7
Good
Substructure
5
Fair

Bridge Details

Structure #
016619600000000
Year Built
1902
Reconstructed
2020
Length
54.9 m (180.1 ft)
Max Span
21.3 m
Width
24.1 m (79.1 ft)
Lanes
4
Daily Traffic
14,200
Material
Concrete
Design
Arch - Deck
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$1,498,000
Total Project Cost
$2,247,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.