STATE ST over MAIN BR CHICAGO RIV

309 N STATE · County 031, Illinois · Built 1949 · 5 Lanes · 6,900 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
5
Fair
Superstructure
4
Poor
Substructure
5
Fair

Bridge Details

Structure #
016604800000000
Year Built
1949
Reconstructed
1994
Length
93.7 m (307.4 ft)
Max Span
74.7 m
Width
32.9 m (107.9 ft)
Lanes
5
Daily Traffic
6,900
Material
Steel
Design
Movable - Bascule
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$2,334,000
Total Project Cost
$3,501,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.