E SOUTH WATER ST over GARLAND COURT

350 N & 50 E · County 031, Illinois · Built 1926 · 2 Lanes · 4,150 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
016613900000000
Year Built
1926
Reconstructed
2002
Length
112.8 m (370.1 ft)
Max Span
12.2 m
Width
19.9 m (65.3 ft)
Lanes
2
Daily Traffic
4,150
Material
Prestressed Concrete
Design
Slab
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$2,579,000
Total Project Cost
$3,869,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.