IL 50 (CICERO AVE over N BR CHICAGO RIVER

0.4 M S US 14 · County 031, Illinois · Built 2007 · 4 Lanes · 13,800 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
016278200000000
Year Built
2007
Length
38.1 m (125 ft)
Max Span
35.4 m
Width
21 m (68.9 ft)
Lanes
4
Daily Traffic
13,800
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.