DEVON AVE over I- 94 EDENS
0.5 M N US 14 · County 031, Illinois · Built 1949 · 4 Lanes · 22,400 vehicles/day
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 6 | Satisfactory |
Location
41.997253, -87.750206
This bridge is in worse condition than 62.9% of bridges in County 031. The average bridge in Illinois is 0 years old; this one is 77 years old.
Nearby Bridges
US 14 (PETERSON AV over I- 94 EDENS
Built 1948
PRATT AVE over I- 94 EDENS
Built 1949
I- 94 EDENS over FOREST GLEN AVE
Built 1949
I- 94 EDENS over N BR CHICAGO RIVER
Built 1949
IL 50 (CICERO AVE over N BR CHICAGO RIVER
Built 2007
CENTRAL AVE over N BR CHICAGO RIVER
Built 1993
FOREST GLEN AV over N BRANCH CHICAGO RIV
Built 2004
TOUHY AVE over I- 94 EDENS
Built 1950
I- 94 EDENS over IL 50 (CICERO AVE)
Built 1948
FOREST PRESERVE DR over I- 94 EDENS
Built 1957
Bridge Details
- Structure #
- 016083400000000
- Year Built
- 1949
- Reconstructed
- 1979
- Length
- 70.5 m (231.3 ft)
- Max Span
- 19.2 m
- Width
- 20.8 m (68.2 ft)
- Lanes
- 4
- Daily Traffic
- 22,400
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $299,000
- Total Project Cost
- $359,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.