135TH ST over TINLEY CREEK

1.5 M W OF IL 50 · County 031, Illinois · Built 2003 · 2 Lanes · 12,800 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
016271500000000
Year Built
2003
Length
22 m (72.2 ft)
Max Span
21.6 m
Width
13 m (42.7 ft)
Lanes
2
Daily Traffic
12,800
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.