IL 50/83 CICERO A over CAL SAG CHANNEL
0.4 M S of 127th St · County 031, Illinois · Built 1938 · 4 Lanes · 32,900 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
5
Fair
Superstructure
4
Poor
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 4 | Poor |
| Substructure | 6 | Satisfactory |
Location
41.655831, -87.738392
This bridge is in worse condition than 86.6% of bridges in County 031. The average bridge in Illinois is 0 years old; this one is 88 years old.
Nearby Bridges
127TH ST over I-294
Built 1958
127TH ST over I-294 TOLL RAMP
Built 1958
FLY-OVER RAMP over SB I-294
Built 2000
IL 50 (CICERO AVE over I-294 TRI STATE TOLL
Built 1958
I-294 SB over 131ST ST
Built 1958
I-294 NB over 131ST ST
Built 1958
127TH ST over CAL SAG CHANNEL
Built 1968
I-294 SB over CAL SAG CANAL
Built 1958
I-294 NB over CAL SAG CANAL
Built 1958
IL 83 (CAL SAG RD over TINLEY CREEK
Built 2022
Bridge Details
- Structure #
- 016042100000000
- Year Built
- 1938
- Reconstructed
- 2012
- Length
- 115.5 m (378.9 ft)
- Max Span
- 82.3 m
- Width
- 17.9 m (58.7 ft)
- Lanes
- 4
- Daily Traffic
- 32,900
- Material
- Steel
- Design
- Truss - Thru
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,307,000
- Total Project Cost
- $1,963,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.