127TH ST over I-294

0.1 M E IL 50 · County 031, Illinois · Built 1958 · 4 Lanes · 33,700 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
016090700000000
Year Built
1958
Reconstructed
2002
Length
118.8 m (389.8 ft)
Max Span
40.2 m
Width
35.4 m (116.1 ft)
Lanes
4
Daily Traffic
33,700
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,078,000
Total Project Cost
$3,117,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.