HALSTED ST over OHIO STREET FEEDER

0.2 M E I-94 · County 031, Illinois · Built 1957 · 4 Lanes · 14,300 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
016211800000000
Year Built
1957
Reconstructed
1999
Length
30.9 m (101.4 ft)
Max Span
15.2 m
Width
20.4 m (66.9 ft)
Lanes
4
Daily Traffic
14,300
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,060,000
Total Project Cost
$1,590,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.