HUBBARD ST over I- 90 94 JFK

1 M N&NW I-290 · County 031, Illinois · Built 1959 · 4 Lanes · 3,650 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
4
Poor
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
016205000000000
Year Built
1959
Reconstructed
1995
Length
62.2 m (204.1 ft)
Max Span
30 m
Width
22.2 m (72.8 ft)
Lanes
4
Daily Traffic
3,650
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,287,000
Total Project Cost
$3,431,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.