55TH ST WB GARFLD over I- 90 94 RYAN & CTA

AT 55TH ST · County 031, Illinois · Built 1962 · 5 Lanes · 22,900 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
016115300000000
Year Built
1962
Reconstructed
1999
Length
83.3 m (273.3 ft)
Max Span
21.9 m
Width
20.5 m (67.3 ft)
Lanes
5
Daily Traffic
22,900
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,031,000
Total Project Cost
$3,047,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.