57TH ST over I- 90 94 RYAN & CTA

0.2 M S 55TH ST · County 031, Illinois · Built 1962 · 4 Lanes · 550 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
016115100000000
Year Built
1962
Reconstructed
2005
Length
101.3 m (332.3 ft)
Max Span
23.5 m
Width
20.4 m (66.9 ft)
Lanes
4
Daily Traffic
550
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$3,019,000
Total Project Cost
$4,529,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.