IL 171 NB over JOLIET RD&BN RR SPUR

0.8 M NW I-55 · County 031, Illinois · Built 1964 · 2 Lanes · 40,100 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
016100600000000
Year Built
1964
Reconstructed
1994
Length
104.6 m (343.2 ft)
Max Span
25.1 m
Width
11.9 m (39 ft)
Lanes
2
Daily Traffic
40,100
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$882,000
Total Project Cost
$1,233,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.