IL 171 (1ST AVE) over DES PLAINES RIVER

0.7 M N IL 64 · County 031, Illinois · Built 1931 · 4 Lanes · 20,100 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
016069700000000
Year Built
1931
Reconstructed
1980
Length
59 m (193.6 ft)
Max Span
20.1 m
Width
19.2 m (63 ft)
Lanes
4
Daily Traffic
20,100
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,880,000
Total Project Cost
$2,820,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.