IL 64 (NORTH AVE) over DITCH

BETWEEN 20TH & 21ST · County 031, Illinois · Built 1927 · 5 Lanes · 50,800 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
016125900000000
Year Built
1927
Reconstructed
1955
Length
10.1 m (33.1 ft)
Max Span
3.4 m
Lanes
5
Daily Traffic
50,800
Material
Concrete Continuous
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.