I- 57 NB over VERMONT ST

2.5 NE ILL 83 · County 031, Illinois · Built 1966 · 3 Lanes · 54,850 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
016006700000000
Year Built
1966
Reconstructed
2004
Length
50.2 m (164.7 ft)
Max Span
21.3 m
Width
18 m (59.1 ft)
Lanes
3
Daily Traffic
54,850
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$820,000
Total Project Cost
$1,230,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.