I- 57 SB over VERMONT ST

2.5 NE ILL 83 · County 031, Illinois · Built 1966 · 4 Lanes · 54,850 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
016006600000000
Year Built
1966
Reconstructed
2002
Length
50.2 m (164.7 ft)
Max Span
21.3 m
Width
20.7 m (67.9 ft)
Lanes
4
Daily Traffic
54,850
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$678,000
Total Project Cost
$1,119,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.