TR 78 A over FLAT BRANCH
.1 MI S HUMBOLDT · County 029, Illinois · Built 1929 · 2 Lanes · 25 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
2
Critical
Superstructure
4
Poor
Substructure
4
Poor
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 2 | Critical |
| Superstructure | 4 | Poor |
| Substructure | 4 | Poor |
Location
39.599867, -88.322058
This bridge is in worse condition than 99.7% of bridges in County 029. The average bridge in Illinois is 0 years old; this one is 97 years old.
Nearby Bridges
TR 88 over FLAT BRANCH
Built 1994
FAP 824 over Flat Branch
Built 2023
FAS 1672(CH 16) over FLAT BRANCH
Built 1984
I-57 (NB) over S FORK FLAT BRANCH
Built 1967
I-57 (SB) over S FORK FLAT BRANCH
Built 1967
TR 76 over FLAT BRANCH
Built 2024
TR 100A over FLAT BRANCH CREEK
Built 1981
TR 69 over I-57
Built 1967
TR 39 B over FLAT BRANCH
Built 1954
CH 16(FAS 1672) over I-57
Built 1967
Bridge Details
- Structure #
- 015309500000000
- Year Built
- 1929
- Reconstructed
- 1954
- Length
- 26.2 m (86 ft)
- Max Span
- 13 m
- Width
- 6.8 m (22.3 ft)
- Lanes
- 2
- Daily Traffic
- 25
- Material
- Concrete
- Design
- Other
- Owner
- Town or Township Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $783,000
- Total Project Cost
- $872,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.