I-57 (SB) over S FORK FLAT BRANCH

.5 MI S HUMBOLDT · County 029, Illinois · Built 1967 · 2 Lanes · 11,350 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
015001000000000
Year Built
1967
Length
28.2 m (92.5 ft)
Max Span
10.4 m
Width
13.3 m (43.6 ft)
Lanes
2
Daily Traffic
11,350
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$485,000
Total Project Cost
$566,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.