TR 193 over BIG GEORGE BRANCH
1 MI N. ASSUMPTION · County 021, Illinois · Built 1963 · 2 Lanes · 50 vehicles/day
Overall
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 6 | Satisfactory |
| Substructure | 5 | Fair |
Location
39.537969, -89.044911
This bridge is in worse condition than 49.4% of bridges in County 021. The average bridge in Illinois is 0 years old; this one is 63 years old.
Nearby Bridges
TR 185 over BIG GEORGE BRANCH
Built 1962
CH 6-FAS642 over BIG GEORGE BRANCH
Built 1988
TR 290 over BIG GEORGE BRANCH
Built 1900
TR 58A over SORGHUM BRANCH
Built 1939
TR 49 over SORGHUM BRANCH
Built 1970
TR 282A over OAK BRANCH
Built 1966
TR 185 over OAK BRANCH
Built 1900
TR 169 over BID GEORGE BR
Built 2009
TR 217A over BIG GEORGE BRANCH
Built 1978
TR 282A over OAK BRANCH
Built 1966
Bridge Details
- Structure #
- 011315100000000
- Year Built
- 1963
- Length
- 16.3 m (53.5 ft)
- Max Span
- 15.2 m
- Width
- 8.5 m (27.9 ft)
- Lanes
- 2
- Daily Traffic
- 50
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- Town or Township Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $132,000
- Total Project Cost
- $198,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.