TR 230 over I-74

1 MI NW OF MAYVIEW · County 019, Illinois · Built 2010 · 2 Lanes · 275 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good

Condition Ratings

ComponentRatingDescription
Deck 7 Good
Superstructure 8 Very Good
Substructure 8 Very Good

Location

40.1209, -88.124692

This bridge is in worse condition than 18.3% of bridges in County 019. The average bridge in Illinois is 0 years old; this one is 16 years old.

Nearby Bridges

Bridge Details

Structure #
010028800000000
Year Built
2010
Length
67.7 m (222.1 ft)
Max Span
33.8 m
Width
9.5 m (31.2 ft)
Lanes
2
Daily Traffic
275
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.