CH 24 over SALINE BRANCH DRAIN

1.5 MI N OF MAYVIEW · County 019, Illinois · Built 1936 · 2 Lanes · 575 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
010015200000000
Year Built
1936
Length
26.7 m (87.6 ft)
Max Span
12.8 m
Width
8.6 m (28.2 ft)
Lanes
2
Daily Traffic
575
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.