TR 271A over W BUREAU CREEK
0.5 E WYANET · County 011, Illinois · Built 2011 · 2 Lanes · 300 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
41.3516, -89.567128
This bridge is in worse condition than 11.2% of bridges in County 011. The average bridge in Illinois is 0 years old; this one is 15 years old.
Nearby Bridges
US 6/34 over WEST BUREAU CREEK
Built 2000
FAS 188A/CH8 over HENNEPIN CANAL/IAIS
Built 2011
TOWNSHIP ROAD 277 over BRANCH OF POND CREEK
Built 1980
FAS 188A/CH 8 over POND CREEK
Built 1931
FAS 188A/CH 8 over BNSF RAILROAD
Built 1999
TR 271 (1400N) over BRANCH OF POND CREEK
Built 1920
TR 170-B over BR W. BUREAU CREEK
Built 1998
TR 277 over W BUREAU CRK
Built 2002
US 6/34 over DRAINAGE DITCH
Built 1993
PARK ACCESS RD over HENNEPIN CANAL
Built 1904
Bridge Details
- Structure #
- 006437600000000
- Year Built
- 2011
- Length
- 35.2 m (115.5 ft)
- Max Span
- 35.2 m
- Width
- 7.3 m (24 ft)
- Lanes
- 2
- Daily Traffic
- 300
- Material
- Steel
- Design
- Truss - Thru
- Owner
- Town or Township Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.