PARK ACCESS RD over HENNEPIN CANAL
.75 MI W OF WYANET · County 011, Illinois · Built 1904 · 1 Lanes · 50 vehicles/day
Overall
Deck
8
Very Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
41.364506, -89.606439
This bridge is in worse condition than 41.7% of bridges in County 011. The average bridge in Illinois is 0 years old; this one is 122 years old.
Nearby Bridges
US 6/34 over DRAINAGE DITCH
Built 1993
FAS 188A/CH 8 over BNSF RAILROAD
Built 1999
TR 271 (1400N) over BRANCH OF POND CREEK
Built 1920
1200 E (TR 148) over POND CREEK
Built 1993
FAS 188A/CH8 over HENNEPIN CANAL/IAIS
Built 2011
FAS 188A/CH 8 over POND CREEK
Built 1931
US 6/34 over DRAINAGE DITCH
Built 1993
TOWNSHIP ROAD 277 over BRANCH OF POND CREEK
Built 1980
US 6/34 over WEST BUREAU CREEK
Built 2000
TR 170-B over BR W. BUREAU CREEK
Built 1998
Bridge Details
- Structure #
- 006995200000000
- Year Built
- 1904
- Reconstructed
- 1976
- Length
- 12.2 m (40 ft)
- Max Span
- 11.9 m
- Width
- 4.3 m (14.1 ft)
- Lanes
- 1
- Daily Traffic
- 50
- Material
- Steel
- Design
- Movable - Lift
- Owner
- State Park, Forest, or Reservation Agency
- Last Inspected
- N/A
- Est. Improvement
- $57,000
- Total Project Cost
- $86,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.