TR 336 over PIKE CREEK
2.5 MI SW LAMOILLE · County 011, Illinois · Built 1910 · 1 Lanes · 25 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
4
Poor
Superstructure
4
Poor
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 4 | Poor |
| Superstructure | 4 | Poor |
| Substructure | 5 | Fair |
Location
41.510819, -89.324956
This bridge is in worse condition than 84.2% of bridges in County 011. The average bridge in Illinois is 0 years old; this one is 116 years old.
Nearby Bridges
CH 22A over BUREAU CREEK
Built 1977
VAN ORIN RD / CH 2 over BUREAU CREEK
Built 1989
TOWHSHIP ROAD 57 over BUREAU CREEK
Built 1980
TR 87 over PIKE CREEK
Built 2006
US 34 FAS 1249 over PIKE CREEK
Built 2011
TOWNSHIP ROAD 74 over MASTERS CR.
Built 1965
TOWNSHIP ROAD 99 over BUREAU CREEK
Built 1982
IL 89 FAP 698 over PIKE CREEK
Built 2011
TR 312 over Masters Fork Branch
Built 1960
2650E (FAS1245/CH2 over BRANCH MASTERS CREEK
Built 1929
Bridge Details
- Structure #
- 006417700000000
- Year Built
- 1910
- Length
- 16.2 m (53.1 ft)
- Max Span
- 15.7 m
- Width
- 6.4 m (21 ft)
- Lanes
- 1
- Daily Traffic
- 25
- Material
- Concrete
- Design
- Other
- Owner
- Town or Township Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $98,000
- Total Project Cost
- $147,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.