2650E (FAS1245/CH2 over BRANCH MASTERS CREEK

1 MI SE. OF VAN ORIN · County 011, Illinois · Built 1929 · 2 Lanes · 225 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
006311100000000
Year Built
1929
Reconstructed
1992
Length
17 m (55.8 ft)
Max Span
15.8 m
Width
8.5 m (27.9 ft)
Lanes
2
Daily Traffic
225
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.