EAST MAIN STREET over EAST CANAL
IN OAKLEY · County 031, Idaho · Built 2020 · 2 Lanes · 360 vehicles/day
Overall
Culvert
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 7 | Good |
Location
42.243053, -113.878625
This bridge is in worse condition than 7.7% of bridges in County 031. The average bridge in Idaho is 0 years old; this one is 6 years old.
Bridge Details
- Structure #
- 000000000034495
- Year Built
- 2020
- Length
- 6.1 m (20 ft)
- Max Span
- 6.1 m
- Width
- 12.4 m (40.7 ft)
- Lanes
- 2
- Daily Traffic
- 360
- Material
- Aluminum, Wrought Iron, or Cast Iron
- Design
- Culvert
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.