500 WEST over EAST CANAL

1.9 S. 0.8 W. OAKLEY · County 031, Idaho · Built 1952 · 2 Lanes · 200 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Condition Ratings

ComponentRatingDescription
Deck 5 Fair
Superstructure 5 Fair
Substructure 5 Fair

Location

42.215967, -113.897875

This bridge is in worse condition than 86.3% of bridges in County 031. The average bridge in Idaho is 0 years old; this one is 74 years old.

Nearby Bridges

Bridge Details

Structure #
000000000023970
Year Built
1952
Length
8.2 m (26.9 ft)
Max Span
7.6 m
Width
7.4 m (24.3 ft)
Lanes
2
Daily Traffic
200
Material
Concrete
Design
Slab
Owner
Other Local Agencies
Last Inspected
N/A
Est. Improvement
$217,000
Total Project Cost
$326,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.