500 WEST over EAST CANAL
1.9 S. 0.8 W. OAKLEY · County 031, Idaho · Built 1952 · 2 Lanes · 200 vehicles/day
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 5 | Fair |
Location
42.215967, -113.897875
This bridge is in worse condition than 86.3% of bridges in County 031. The average bridge in Idaho is 0 years old; this one is 74 years old.
Bridge Details
- Structure #
- 000000000023970
- Year Built
- 1952
- Length
- 8.2 m (26.9 ft)
- Max Span
- 7.6 m
- Width
- 7.4 m (24.3 ft)
- Lanes
- 2
- Daily Traffic
- 200
- Material
- Concrete
- Design
- Slab
- Owner
- Other Local Agencies
- Last Inspected
- N/A
- Est. Improvement
- $217,000
- Total Project Cost
- $326,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.