BASELINE RD over TRAIL CREEK

1.0 S. 0.5 E. VICTOR · County 081, Idaho · Built 2003 · 2 Lanes · 20 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000000033091
Year Built
2003
Length
9.2 m (30.2 ft)
Max Span
8.5 m
Width
9.8 m (32.2 ft)
Lanes
2
Daily Traffic
20
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.