SH 31 over TRAIL CREEK;VICTOR BR

0.3 S. VICTOR · County 081, Idaho · Built 1996 · 2 Lanes · 6,200 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
000000000013856
Year Built
1996
Length
6.7 m (22 ft)
Max Span
6.7 m
Width
15.4 m (50.5 ft)
Lanes
2
Daily Traffic
6,200
Material
Concrete
Design
Frame (except frame culverts)
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.