STC 7736;N 2ND W over REXBURG CANAL
IN REXBURG;N. 2ND W. ST · County 065, Idaho · Built 1978 · 2 Lanes · 800 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
43.830336, -111.794689
This bridge is in worse condition than 32.5% of bridges in County 065. The average bridge in Idaho is 0 years old; this one is 48 years old.
Nearby Bridges
W. 1ST NORTH ST over REXBURG CANAL
Built 1976
W. 3RD NORTH ST over REXBURG CANAL
Built 1977
W. 2ND NORTH ST over REXBURG CANAL
Built 1977
W 1ST SOUTH ST over REXBURG CANAL
Built 2019
STC 7826;W. 2ND S. over REXBURG CANAL
Built 1978
N. 1ST EAST STREET over REXBURG CANAL
Built 1977
US 20 WBL over SH 33;REXBURG IC
Built 1981
SH 33 over REXBURG CANAL
Built 1938
US 20 EBL over SH 33;REXBURG IC
Built 1981
SH 33 over S.FK.TETON RIVER
Built 1971
Bridge Details
- Structure #
- 000000000032990
- Year Built
- 1978
- Length
- 7 m (23 ft)
- Max Span
- 7 m
- Width
- 16.4 m (53.8 ft)
- Lanes
- 2
- Daily Traffic
- 800
- Material
- Concrete
- Design
- Frame (except frame culverts)
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $341,000
- Total Project Cost
- $512,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.