W. 3RD NORTH ST over REXBURG CANAL
IN REXBURG;W.3RD N.ST · County 065, Idaho · Built 1977 · 2 Lanes · 380 vehicles/day
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 7 | Good |
Location
43.832511, -111.793228
This bridge is in worse condition than 78.8% of bridges in County 065. The average bridge in Idaho is 0 years old; this one is 49 years old.
Nearby Bridges
STC 7736;N 2ND W over REXBURG CANAL
Built 1978
W. 2ND NORTH ST over REXBURG CANAL
Built 1977
W. 1ST NORTH ST over REXBURG CANAL
Built 1976
W 1ST SOUTH ST over REXBURG CANAL
Built 2019
N. 1ST EAST STREET over REXBURG CANAL
Built 1977
STC 7826;W. 2ND S. over REXBURG CANAL
Built 1978
SH 33 over REXBURG CANAL
Built 1938
SH 33 over S.FK.TETON RIVER
Built 1971
N 3RD E over REXBURG CANAL
Built 1980
US 20 WBL over SH 33;REXBURG IC
Built 1981
Bridge Details
- Structure #
- 000000000032985
- Year Built
- 1977
- Length
- 7 m (23 ft)
- Max Span
- 7 m
- Width
- 14 m (45.9 ft)
- Lanes
- 2
- Daily Traffic
- 380
- Material
- Concrete
- Design
- Frame (except frame culverts)
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $312,000
- Total Project Cost
- $468,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.