IDFG ACCESS ROAD over SALMON RIVER

13.9 N. 9.3 E. CHALLIS · County 059, Idaho · Built 1989 · 1 Lanes · 30 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Condition Ratings

ComponentRatingDescription
Deck 7 Good
Superstructure 7 Good
Substructure 6 Satisfactory

Location

44.702964, -114.043144

This bridge is in worse condition than 57% of bridges in County 059. The average bridge in Idaho is 0 years old; this one is 37 years old.

Nearby Bridges

Bridge Details

Structure #
000000000032760
Year Built
1989
Length
57.9 m (190 ft)
Max Span
28.3 m
Width
4.6 m (15.1 ft)
Lanes
1
Daily Traffic
30
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
Other State Agencies
Last Inspected
N/A
Est. Improvement
$1,035,000
Total Project Cost
$1,552,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.