US 93 over PAHSIMEROI RIVER

AT ELLIS;17 N. CHALLIS · County 037, Idaho · Built 1938 · 2 Lanes · 1,100 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Condition Ratings

ComponentRatingDescription
Deck 7 Good
Superstructure 7 Good
Substructure 6 Satisfactory

Location

44.691833, -114.048764

This bridge is in worse condition than 32.5% of bridges in County 037. The average bridge in Idaho is 0 years old; this one is 88 years old.

Nearby Bridges

Bridge Details

Structure #
000000000017870
Year Built
1938
Length
34.4 m (112.9 ft)
Max Span
16.8 m
Width
9.4 m (30.8 ft)
Lanes
2
Daily Traffic
1,100
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$924,000
Total Project Cost
$1,386,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.