N 700 WEST STREET over EGIN CANAL
IN ST ANTHONY;N.700W.ST · County 043, Idaho · Built 1973 · 2 Lanes · 210 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 5 | Fair |
Location
43.964958, -111.691753
This bridge is in worse condition than 75.4% of bridges in County 043. The average bridge in Idaho is 0 years old; this one is 53 years old.
Nearby Bridges
STC6764;W MAIN ST over EGIN CANAL
Built 1986
S 2ND WEST STREET over EGIN CANAL
Built 2020
US 20B over EGIN CANAL
Built 1975
US 20B over HENRYS FK. SNAKE RIVER
Built 1965
US 20B;BRIDGE ST over US 20;ST. ANTHONY IC
Built 1984
E 500 N over ST. ANTHONY UNION CANAL
Built 1995
CEMETARY ACCESS RD over INDEPENDENT CANAL
Built 1980
S 100 EAST STREET over SALEM UNION CANAL
Built 1980
STC6803;S YLWSTONE over SALEM UNION CANAL
Built 2002
N 2300 E over ST. ANTHONY CANAL
Built 1970
Bridge Details
- Structure #
- 000000000032230
- Year Built
- 1973
- Length
- 8.8 m (28.9 ft)
- Max Span
- 4.3 m
- Width
- 8.5 m (27.9 ft)
- Lanes
- 2
- Daily Traffic
- 210
- Material
- Prestressed Concrete
- Design
- Tee Beam
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $122,000
- Total Project Cost
- $183,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.