US 20B;BRIDGE ST over US 20;ST. ANTHONY IC
IN ST ANTHONY · County 043, Idaho · Built 1984 · 4 Lanes · 8,300 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
43.962819, -111.682064
This bridge is in worse condition than 9.4% of bridges in County 043. The average bridge in Idaho is 0 years old; this one is 42 years old.
Nearby Bridges
US 20B over HENRYS FK. SNAKE RIVER
Built 1965
US 20B over EGIN CANAL
Built 1975
S 2ND WEST STREET over EGIN CANAL
Built 2020
STC 6774;N 2400 E over SALEM UNION CANAL
Built 1986
S 100 EAST STREET over SALEM UNION CANAL
Built 1980
N 700 WEST STREET over EGIN CANAL
Built 1973
STC6803;S YLWSTONE over SALEM UNION CANAL
Built 2002
STC6764;W MAIN ST over EGIN CANAL
Built 1986
HOG HOLLOW;E 500 N over TWIN GROVES CANAL
Built 1955
STC 6774;N 2400 E over TWIN GROVES CANAL
Built 1980
Bridge Details
- Structure #
- 000000000012725
- Year Built
- 1984
- Length
- 66.4 m (217.8 ft)
- Max Span
- 32.9 m
- Width
- 26.4 m (86.6 ft)
- Lanes
- 4
- Daily Traffic
- 8,300
- Material
- Prestressed Concrete Continuous
- Design
- Box Beam or Girders - Single or Spread
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $6,222,000
- Total Project Cost
- $9,333,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.